Central Energy Plants / Generation &
Transmission

(Eagle Academy data center generator – Pam Beach County)

MDC WEST TOWER AND CENTRAL ENERGY PLANT – HVAC AND LIFE SAFETY SYSTEMS UPGRADE, WEST PALM BEACH, FL

The scope of work included providing Mechanical, Plumbing, and Fire Protection services, with key tasks such as lining chiller water and sanitary lines, overhauling the deluge system across six floors, and replacing boilers, AHUs, roof-mounted fans, and two Trane chillers (CH-4 and CH-5) at the Central Plant. Based on Gartek’s HVAC analysis, a full redesign of the West Tower HVAC system was completed, including a new dedicated outside air handler unit, adjacent mechanical room, and three additional mechanical rooms for stair pressurization equipment. The project also involved extensive field verification, updated roof and floor plans, and coordination with project consultants, the Owner, PBC Facilities, PBSO, and the Contractor.

GOVERNMENT CENTER – REPLACE MAIN DISCONNECTS FOR GENERATOR ATS’S, WEST PALM BEACH, FL

Gartek provided engineering services for the replacement of two original 1985 bolted pressure switches supplying the normal input of ATS1 and ATS2 at a 277/480V facility. The scope included design and specification of new equipment with current limiting capabilities, coordination with manufacturers and FPL, and site verification of existing conditions. Gartek prepared construction documents for permitting and bidding, responded to County and permit review comments, and supported PBC throughout bidding and construction with RFI responses, submittal reviews, site visits, and final documentation.

EAGLE ACADEMY DATA CENTER GENERATOR, WEST PALM BEACH, FL

The project involves comprehensive plumbing and electrical design services for the replacement and upgrade of the facility’s emergency power system. The scope includes the removal of the existing generator and concrete pad, followed by the installation of two new 800kW/1,000kVA emergency generators. A new 8,000-gallon above-ground fuel tank, along with associated piping and a 200-gallon day tank, was installed to support continuous generator operation. Existing emergency feeders will be reconnected, and new underground and overhead power and control wiring will be installed as part of the upgraded system. Additionally, the project includes the design and installation of new lighting systems to support the facility’s operational needs.

Central Energy Plants

  • Boynton Beach Head Start Building, Central Energy Plant, Boynton Beach, FL
  • Federal Reserve Bank of Atlanta, Central Energy Plant, Miami, FL
  • Florida Atlantic University, Henderson Building, Central Energy Plant, Boca Raton, FL
  • Gusman Center for the Performing Arts, Central Energy Plant, Miami, FL
  • Kirk’s Harbor Centre, Central Energy Plant, Georgetown, Grand Cayman
  • Lake Worth High School, Central Energy Plant, Lake Worth, FL
  • Lauderdale Manors Elementary School, Central Energy Plant, Ft. Lauderdale, FL
  • MAST Academy, Central Energy Plant, Key Biscayne, FL
  • MIA Concourse D, Pre-Conditioned Air Central Plant, Miami, FL
  • MIA North Terminal, Development Pre-Conditioned Air Central Plant, Miami, FL
  • Miami Institute of Psychology, Central Energy Plant, Miami, FL
  • Multi-Purpose Sports Complex Building, Central Energy Plant, Road Town, Tortola
  • Port of Miami, Central Energy Plant, Miami, FL
  • Post Office Building, Central Energy Plant, Port Purcell, Tortola, BVI
  • Prince Juliana International Airport, Central Energy Plant, San Maarten
  • Shelter Island, Central Energy Plant, Grand Cayman, BWI
  • The International Design Center, Central Energy Plant, Bonita Springs, FL
  • The Ritz Carlton Golf Club & Spa, Central Energy Plant, Jupiter, FL
Puerto Rico Power Authority, Mobile Substation

Generation & Transmission

  • City of Miami, Storm Water Pumping Stations, FL
  • Communications Towers UPS and generators at Boynton Beach, Delray, Boca Raton, Jupiter, EMS North, Connemara, Belle Glade, Pahokee, and Forrest Hill
  • Diageo Barrel Storage Facility, New Generator – 350 kW, United States Virgin Islands
  • Federal Reserve Bank of Atlanta, Generators Replacements – 800 kW with 750 kW, Jacksonville, FL
  • Federal Reserve Bank of Atlanta, New (3) paralleled 2 MW Generators, Atlanta, GA
  • Fire Stations 26, 27, 5, Generator Replacements, Palm Beach, FL
  • Four Points Office Building and Supervisor of Elections Building, New Emergency Generator – 900 kW, Palm Beach, FL
  • Krum Bay Substation, Generator Relocation Generator & Emergency Power System, St. Thomas, USVI
  • Lawrence Storm, Sewer Pump Station, Miami, FL
  • Orange Bowl Overtown, Pump Stations, Miami, FL
  • Pahokee, Generator Replacement – 125 kW with 800 MHz, Palm Beach, FL
  • PBC Central High School, New Generator – 450 kW, FL
  • PBC Fairgrounds, New Generators – 1,000 kW & 350 kW, FL
  • PBC Odyssey Middle School, New Generator – 400 kW, FL
  • PBC Public Channel 20, Emergency Generator – 150 kW, Palm Beach, FL
  • PBC Facilities (12), Feasibility study for Emergency Power, Palm Beach, FL
  • PBC Herman Brice Fire Rescue Training Facility, New Generator – 750 kW, FL
  • PBC Main Detention Center, Generators Replacement –800 kW with 2250 kW, FL
  • PBC Main Detention Center, New 1250 kW generator and modifications of two (2) 2250 kW, FL
  • PBC WUD repump station 9N, Generators Replacements – 600 kW with 900 kW, FL
  • PBC Water Utilities Department Operation & Condition Assessments, Repump Station 4100, FL
  • Palm Beach Sheriff’s Office Aviation, New Generator -350 kW
  • Palm Beach Sheriff’s Office Fire Rescue Training Facility, New Generator- 750 kW, FL
  • Palm Tran South, & Palm Tran North, New generators – 500 kW & 900 kW, FL
  • PBC Administration Building, Emergency Generator – 900 kW, Palm Beach, FL