- Caribbean and Latin America
- Central Energy Plants
- Commercial
- Continuing Services
- Design Build
- Due Diligence and Studies
- Educational
- Generation and Transmission
- Healthcare
- Historic Restoration
- Hospitality and Recreation
- Institutional
- Performing Arts
- Plans Review and Inspections
- Residential
- Transportation
Orlando International Airport - Various Projects
Market:
TransportationProject Type:
NewServices Provided:
Project Description:
BP-V227 Airside 1 Wing 6 Restroom Renovations. Prime: HKS Architects. Project started in 2003 and construction completed in 2004.
BP-S013 South Terminal Complex Site Civil. Gartek assisted the civil engineer with the fuel system design for the generators. Never Built.
BP-S016 South Terminal Complex Parking Garage. Project was designed but not built.
BP-S019 South Terminal Complex Remote Receiver and Remote Transmitter Relocation of FAA Facilities. Prime: HNTB. Project part of several other terminal improvements approved for construction in 2005 with an estimated construction cost of $251M.
Services provided on the above included Lighting, Plumbing or Fire Protection Engineering Services
- Electrical Engineering
- Distribution
- Generation & Transmission
- Lighting Design
- Fault Analysis & Coordination Studies
- Lightning Protection
- Electronic System Design
- Voice & Data Distribution
- Public Address/Sound Systems
- Closed-circuit Television
- Fire Alarm & Security Systems
Gartek Engineering's South Florida Locations
Miami-Dade County: 7210 SW 39 Terrace ▪ Miami, Florida 33155 ▪ Phone (305) 266-8997 ▪ Fax (305) 264-9496
Broward County: 730 East Prospect Road #100 ▪ Oakland Park ▪ Florida 33334 ▪ Phone 954-399-2347
Palm Beach County: 4723 W. Atlantic Ave. ▪ Suite A18 ▪ Delray Beach, Florida 33445 ▪ Phone (561) 637-8909 ▪ Fax (561) 637-8959



