- Caribbean and Latin America
- Central Energy Plants
- Commercial
- Continuing Services
- Design Build
- Due Diligence and Studies
- Educational
- Generation and Transmission
- Healthcare
- Historic Restoration
- Hospitality and Recreation
- Institutional
- Performing Arts
- Plans Review and Inspections
- Residential
- Transportation
Orlando International Airport, South Terminal Complex
Market:
TransportationProject Type:
NewServices Provided:
Project Description:
BP-S018 Over 2,200,000 S.F. terminal expansion to accommodate projected passenger growth for the next 20 years. Development will ultimately accommodate 120 aircraft gates and approximately 40 million additional passengers, the STC will more than double the airport’s present capacity.
Phase One of STC will provide 24 aircraft gates and accommodate up to 10 million passengers per year. The facility will be designed to process both domestic and international arriving passengers. Our firm’s responsibilities included design of Lighting and Plumbing for the Landside & Airside Terminals. The project was designed but not built. Construction Costs: $385 M estimated
- Electrical Engineering
- Distribution
- Generation & Transmission
- Lighting Design
- Fault Analysis & Coordination Studies
- Lightning Protection
- Electronic System Design
- Voice & Data Distribution
- Public Address/Sound Systems
- Closed-circuit Television
- Fire Alarm & Security Systems
Gartek Engineering's South Florida Locations
Miami-Dade County: 7210 SW 39 Terrace ▪ Miami, Florida 33155 ▪ Phone (305) 266-8997 ▪ Fax (305) 264-9496
Broward County: 730 East Prospect Road #100 ▪ Oakland Park ▪ Florida 33334 ▪ Phone 954-399-2347
Palm Beach County: 4723 W. Atlantic Ave. ▪ Suite A18 ▪ Delray Beach, Florida 33445 ▪ Phone (561) 637-8909 ▪ Fax (561) 637-8959



