Gartek Engineering Corporation has been providing mechanical, electrical, and plumbing services for over 30 years...

Orlando International Airport Airside 2 Renovations

Go Back

Project Type:



Project Description:

 

Airside 2/BP266 Renovations and Base Building: This project included multiple contracts and start and completion dates varied. Related work within Airside 2 included:

BP 267: Airline Tenant Finishes

BP 269: Central Energy Plant

Airside 2 consists of two initial concourses (with provisions for a third concourse) and provides 16 gates.

The structure consists of two levels: Level One accommodates airline and tenant operational and support spaces. Level Two provides airline passenger departure and arrival processing, seating, restrooms, and appropriate concessions operations.

Airside 2 incorporates a central 3-level hub which supports mechanical, electrical and airport/tenant operational spaces in Level One; accommodates public seating, public circulation, public restrooms, concession space, and an Automated Guideway Transit (AGT) System Station in Level Two; and airline VIP rooms, ramp tower access, and associated mechanical and electrical support areas. Services provided included the design of lighting and plumbing. 291,000 SF / Construction Costs: $71 M

Gartek Engineering's South Florida Locations



Miami-Dade County:     7210 SW 39 Terrace ▪ Miami, Florida 33155 ▪ Phone (305) 266-8997 ▪ Fax (305) 264-9496

Broward County:          2700 N. 29 Avenue ▪ Hollywood, Florida 33020 ▪ Phone 954-404-8100 ▪ Fax: 9544048133

Palm Beach County:    6801 Lake Worth Road. ▪ Suite 117 ▪ Greenacres, Florida 33467 ▪ Phone (561) 249-3431 ▪ Fax (561) 249-3472