Gartek Engineering has extensive experience in electrical power distribution with special emphasis in substation design. Our experience encompasses design in low, medium, and high voltages to 230 kV. our experience in this field is derived from contracts with Florida Power & Light Co., International Power Systems, Inc., Asea Brown-Boveri, and others. Design in this specialized field requires familiarity with relay protection schemes, expertise in the preparation of short circuit and coordination studies, and knowledge of state of the art equipment and devices currently available in the market. Intimacy with protection philosophies and redundancy requirements are paramount if designs are to carry the desired reliability.

White Street Substation, Key West, Florida
New Substation consisting of, two 25/33.3/41.67 kVA, 69-13.8 kV transformers; 6-feeder Metalclad Switchgear: two underground feeders; two capacitor banks; ground grid study and ground grid design; relay coordination study; relay settings; 69 kV underground getaway design including cable selection, schedule of materials, calculations and field erection drawings. 13.8 kV underground main feed from transformer to switchgear including cable selection, schedule of materials, conduit schedule and calculations. All field remote cable schedules for AC and DC circuits as well as current transformer connections. Site lighting and temporary 69 kV and 13.8 kV circuits.

Satala Power Plant, American Samoa
Switchgear replacement. $3M.

McMinn Substation, Homestead, Florida
New feeder positions in existing 23 kV substation. New panel remote wiring diagram and modifications required at mimic board and feeder control board.

Mobile Substation for Puerto Rico Authority (PREPA)
Turnkey project for design and assembly of 12 MVA, 115/38 - 8.32/4.16 kV Substation.

Coconut Grove Substation, Coconut Grove, Florida
Removal of 4 kV section at substation and approximately 2 miles of 4kV feeders. Installed new 13.8 kV section at substation, 35,000 kVA transformer, and two feeders dedicated to the use of the METRORAIL Rapid Transit System.

Juno Beach Substation, Juno Beach, Florida
Increased transformer capacity by adding a third 30 MVA transformer, added 13.8 kV feeder, bur-tie breaker and transformer low-side motor operated vacuum load break switches. Upgraded relay protection scheme to differential protection, extended 138 kV bus, added a third 138 kV pull-off structure and relocated one 138 kV pull-off.

St. Augustine Substation, St. Augustine, Florida
Conversion of 4 kV feeders to 13.8 kV operation, removal of 4 kV transformers and capacitor banks. Relocation of one 115 kV, 13.8 kV, 35 MVA transformer to provide firm capacity of 13.8 kV operating bus. Installation of 115 kV wave traps to effectively prevent grounding of carrier signal through 115 kV capacitor banks. Upgrading of all 13.8 kV feeders for safety purposes, relocated feeder pull-off and step-voltage regulators.

Emergency Generator installation at Palm Beach County Fair Grounds.
New 1,200 kW generator to allow use of the facility as emergency shelter.

Emergency Generator installation at the following facilities:
Palm Beach County Credit Union (100 kW); Connemara Condominium (125 kW For use as PBC's Emergency Communications Center); Credomatic of Florida, Amadeus/EDS/System One; MDPD Police Stations 1, 2, 4, 5, 6, 8; Palm Beach County South County Administration Complex; Caterpilar Training Center (over 1,500kW -4 units).

 
 